D.A.I.C. Process

The four main factors to be considered when looking for a solar PV system to be installed.

  • Design
  • Approval
  • Installation
  • Commissioning

Design

  • Customer ordering works
  • Solar Panel manufacturer
  • Inverter manufacturer
  • Roofing system manufacturer
  • Incoming Main AC Supply
  • Maximum Demand
  • Available Roof Space
  • Roof Structural Calculations
  • Consumption in kWh per day
  • Fire Prevention
  • Opening Times
  • Location of equipment
  • Access to property
  • Budget
  • Other Energy Saving Devices available

Approval

  • G99 Approval
  • G100 Export Limitations

Installation

  • AC Installation
  • DC Installation
  • Scaffolding
  • PPE
  • Access to roof
  • RAMS

Commissioning

  • Structural Calculations
  • Electrical Installation Certification
  • DC String Tests
  • Solar PV building control notification
  • DNO commissioning completed
  • Inverter commissioned
  • Tigo Units confirm correct operation
  • Battery Storage correct operation
  • Online monitoring
  • Customer Satisfied
  • Hand Over pack