D.A.I.C. Process
The four main factors to be considered when looking for a solar PV system to be installed.
- Design
- Approval
- Installation
- Commissioning
Design
- Customer ordering works
- Solar Panel manufacturer
- Inverter manufacturer
- Roofing system manufacturer
- Incoming Main AC Supply
- Maximum Demand
- Available Roof Space
- Roof Structural Calculations
- Consumption in kWh per day
- Fire Prevention
- Opening Times
- Location of equipment
- Access to property
- Budget
- Other Energy Saving Devices available
Approval
- G99 Approval
- G100 Export Limitations
Installation
- AC Installation
- DC Installation
- Scaffolding
- PPE
- Access to roof
- RAMS
Commissioning
- Structural Calculations
- Electrical Installation Certification
- DC String Tests
- Solar PV building control notification
- DNO commissioning completed
- Inverter commissioned
- Tigo Units confirm correct operation
- Battery Storage correct operation
- Online monitoring
- Customer Satisfied
- Hand Over pack